Read rating, count, trade and date together. Stars here reproduce the source's score out of five, not our construction inspection or quality guarantee.
Understand this article's terms in plain language
- Quote total
- Check how much travel, investigation, materials, work and disposal the price includes. Ask separately from the advertised minimum.
- Approve additions
- Approve unplanned work only after receiving an explanation of the reason and cost.
- 01
First check danger and existing contact points
- 02
Organize photos and the work you want
- 03
Check scope, total and schedule
Two 5-star reviews differ from 300 reviews averaging 4.8
A few high ratings help but provide limited evidence of differences by work or date. Many reviews alone do not prove suitability. Look for concrete accounts of similar buildings and the same trade.
From the current situation to the next request
These steps are general guidance organized by the editors.
- 01First check danger and existing contact points
Do not inspect or take photos in dangerous places.
- 02Organize photos and the work you want
Separate known facts from what remains unknown.
- 03Check scope, total and schedule
Agree on the person responsible, cost, timing and way to check.
Distinguish overall company ratings from ratings for the same trade
Overall company stars may combine cleaning, gardening, repairs and other services. Trade-specific scores cover a narrower scope and may have few reviews. Open original reviews from a list identifying its scope, and check which work they evaluate.
Turn dissatisfaction into questions you can verify
For “It took a long time,” ask about arrival estimates and delay notices; for “It cost more,” ask about extra-work conditions and total approval; for “I’m not sure it is fixed,” ask about completion checks and recurrence warranties. Do not apply one reviewer’s experience to all of that company’s work.
Do not downgrade companies without reviews
An absence of reviews is not evidence of poor work. Directly check business details, required qualifications or designations, examples, estimate explanations, warranty and contract conditions. This site does not invent stars; it displays “Rating unconfirmed”.
Frequently asked questions about this topic
Should I choose a five-star company over a four-star company?
Do not choose by scores alone. Read count, dates, matching trades and areas, and sources together. Few high ratings are not as informative as many reviews; check concrete request conditions.
Should a bad review rule a company out?
Check whether the review relates to your job. Turn extras into questions on approval, delays into communication, and finish into completion checks. Reviews alone do not establish facts or company-wide quality.
FAQ and related guidance checked October 4, 2026. Ask relevant contacts about individual conditions, current acceptance, and programs.
Content errors, rights concerns or service information changes:Contact Kaneyoshi Miwa (Japan Product Management). Include the page URL and relevant passage. This is for routine inquiries, not emergency reporting.
What to learn next

Before signing repairs: record scope, payments, and warranties
Before contracting roof/leak repairs, check scope, schedule, payment, extras, warranty and cancellation terms.

Roof-repair quotes: eight comparison items beyond price
A practical checklist for comparing equivalent quotes: inspections, scaffolding, repair scope, dates, warranty and extras.

After repairs: completion, warranty, and recurrence records
Roof and leak-repair completion checks: keep photos and documents without climbing onto the roof.
Before arranging repairs in Japan
You do not need to rush a decision when you do not understand the documents or explanation.
An estimate and a contract have different purposes
An estimate (見積書) describes proposed work and its price. If you do not understand what you would be agreeing to, ask about the work, extra charges and schedule before deciding.
If communicating in Japanese is difficult
Ask in advance whether an interpreter can help and which languages the provider supports. Translated articles do not mean that our phone service or contractors provide English or Vietnamese support.
Reference: Housing Renovation and Dispute Settlement Support Center — estimate consultations
Words used in this article
Short explanations, with the Japanese words you may hear in everyday life.
- Recurrence 再発(saihatsu)
A problem happening again after it appeared to have stopped.
Record when it happens and the weather, then check the previous work and warranty when asking for advice.
- Warranty 保証(hoshou)
Conditions describing how certain problems after the work will be handled.
Check coverage, period, exclusions and contact details in writing; a warranty does not make every repair free.
- Written estimate 見積書(mitsumorisho / mitsumori)
A document showing proposed work, materials and costs before you place an order.
Ask for explanations of Japanese wording you do not understand before signing an agreement.
- Additional charges 追加費用(tsuika hiyou / tsuika ryoukin)
Costs added later to the amount first proposed.
Confirm the extra work, reason and amount in writing before that work starts.
Plain-language explanations by Tatemono Fukkyu Note. They are not an assessment of your building or an individual evacuation decision.