Do not inspect from the roof yourself. Compare the contract with before/after photos and completion reports. Keep warranties, invoices and contacts, and agree recurrence reporting.
Understand this article's terms in plain language
- Cause investigation
- Investigation of water-entry routes and similar issues. Ask methods, cost, and uncheckable areas.
- Approve additions
- Approve unplanned work only after receiving an explanation of the reason and cost.
- Inspection scope
- Which places and methods the investigation covers. Ask about inaccessible areas and fees beforehand.

- 01
Compare the agreed work with the completion report
- 02
Check remaining work, warranty and payment terms
- 03
Record changes after the next rain or resuming use
Questions for the completion report
Ask what cause was addressed, work, materials, scope, extras, tests and unfinished areas. Have hidden roof and other work explained with photos.
Confirm completion through work, documents and later conditions
Checks immediately after repair differ from those after rain or resumed use.
Was the work completed as agreed?
Check scope, completion photos, and remaining work.
Do you still have the warranty and contacts?
Billing, warranty coverage and period, and how to report a recurrence.
Any changes with the next rain or use?
Record changes in stains or leaks with photos and dates.
Is the building, including its interior, usable?
After exterior work, interior drying, finishes, or electrical checks may remain. Ask each person responsible about conditions for resuming living or business. Restored appearance alone does not mean all safety checks are complete.
Prepare for a recurrence
Keep the immediate post-work condition, next rainfall date, leak location, photos, and communications in the same case record. Confirm repeat-investigation fees, warranty scope, and visit timing. Ask the original contractor first whether another provider’s work affects the warranty.
Frequently asked questions about this topic
Can I wait until it rains before paying?
Check payment timing in the contract. Agree on any concerns about completion checks beforehand; avoid changing terms unilaterally at completion.
FAQ and related guidance checked October 4, 2026. Ask relevant contacts about individual conditions, current acceptance, and programs.
Content errors, rights concerns or service information changes:Contact Kaneyoshi Miwa (Japan Product Management). Include the page URL and relevant passage. This is for routine inquiries, not emergency reporting.
What to learn next

Before signing repairs: record scope, payments, and warranties
Before contracting roof/leak repairs, check scope, schedule, payment, extras, warranty and cancellation terms.

Extra repair costs: five checks before approval
If told extra substrate repairs are needed, check photos, reasons, price, duration, and alternatives.

What should you do first when rain leaks into your home?
When water drips from the ceiling, organize what you can and must not do: safety, moving belongings, photos, and explaining the problem to providers.
Words used in this article
Short explanations, with the Japanese words you may hear in everyday life.
- Warranty 保証(hoshou)
Conditions describing how certain problems after the work will be handled.
Check coverage, period, exclusions and contact details in writing; a warranty does not make every repair free.
- Recurrence 再発(saihatsu)
A problem happening again after it appeared to have stopped.
Record when it happens and the weather, then check the previous work and warranty when asking for advice.
Plain-language explanations by Tatemono Fukkyu Note. They are not an assessment of your building or an individual evacuation decision.