Approve additions after checking reasons, current photos, price, schedule effects, and alternatives. Agree at contracting that extras require consent, except urgent safety measures.
Understand this article's terms in plain language
- Quote total
- Check how much travel, investigation, materials, work and disposal the price includes. Ask separately from the advertised minimum.
- Approve additions
- Approve unplanned work only after receiving an explanation of the reason and cost.

- 01
Verify extra work with photos and explanations
- 02
Obtain the extra amount including tax and the revised total
- 03
Record the agreement before proceeding
Was it genuinely hidden from view?
Some issues, such as deteriorated backing, emerge only after dismantling. Still, ask whether they could have been anticipated when quoting. Have the provider identify what was uncertain against the original quote.
Extra work: explanation → price → agreement
Record revisions before proceeding with work.
- 01Check photos and explanations
Where and why is additional work needed?
- 02Check the extra amount and total
Tax-inclusive extras, revised total and work period
- 03Record what you approved
Record the agreement before starting work
Information needed in an additional quote
Ask for added or removed work items, quantities and unit prices, reasons for additions, revised total, completion schedule, and warranty effects in writing. If told only “another ¥… for everything,” request a breakdown. Also check consequences of declining and necessary safety measures.
Put verbal agreements into writing
As discussions progress on site, record details in messages or revised quotes to align both parties’ understanding. For premises where the owner is absent, decide who can approve and the spending limit. If sales and site personnel differ, confirm who formally accepted the request.
When you receive a bill you cannot accept
Organize the original contract, quote, photos, messages, and any approval of additions. Before emotional exchanges or deciding payment obligations yourself, request the provider’s basis and, if needed, consult Sumairu Dial or a consumer affairs center.
Frequently asked questions about this topic
Can I refuse all additional work?
Safety or building conditions may require action. This site cannot judge whether it is unnecessary. Ask about reasons and options.
FAQ and related guidance checked October 4, 2026. Ask relevant contacts about individual conditions, current acceptance, and programs.
Content errors, rights concerns or service information changes:Contact Kaneyoshi Miwa (Japan Product Management). Include the page URL and relevant passage. This is for routine inquiries, not emergency reporting.
What to learn next

Roof-repair quotes: eight comparison items beyond price
A practical checklist for comparing equivalent quotes: inspections, scaffolding, repair scope, dates, warranty and extras.

Before signing repairs: record scope, payments, and warranties
Before contracting roof/leak repairs, check scope, schedule, payment, extras, warranty and cancellation terms.

After repairs: completion, warranty, and recurrence records
Roof and leak-repair completion checks: keep photos and documents without climbing onto the roof.
Words used in this article
Short explanations, with the Japanese words you may hear in everyday life.
- Warranty 保証(hoshou)
Conditions describing how certain problems after the work will be handled.
Check coverage, period, exclusions and contact details in writing; a warranty does not make every repair free.
- Itemized breakdown 内訳(uchiwake)
A total price or scope divided into individual items.
Ask what each amount covers, such as materials, quantity, labour or transport.
Plain-language explanations by Tatemono Fukkyu Note. They are not an assessment of your building or an individual evacuation decision.