Give every company the same photos, symptoms and wishes before comparing prices. Quotes with different methods and scope cannot be meaningfully ranked by price.
Understand this article's terms in plain language
- Temporary measures
- Temporary measures to limit further damage. Check these separately from permanent repairs and fixing the cause.
- Cause investigation
- Investigation of water-entry routes and similar issues. Ask methods, cost, and uncheckable areas.
- Scaffolding and protection
- Scaffolding supports work at height; protection shields surrounding items and areas. Check quote scope.

- 01
Share the same request notes with each company
- 02
Ask about and fill in missing conditions
- 03
Decide after checking availability and conditions for extra work
Eight comparison points
1. Cause explanation and investigation method; 2. Locations, methods and materials; 3. Scaffolding and protection; 4. Travel, investigation, removal, disposal and tax; 5. Temporary-visit and main-work dates; 6. Conditions for extra work and approval; 7. Warranty coverage, period and exclusions; 8. Contracting party, payment and cancellation conditions. Matching these eight items makes it easier to question differences between estimates.
Align quote contents before comparing totals
Example comparison. Check actual company quotes using the same items.
Ask about missing items before comparing costs and timing.
If estimates differ greatly
One company may assume partial repair and another extensive underlying-layer repair. Ask which photos or findings led them to judge that scope necessary. Organizing unknowns comes before negotiating down a total you cannot yet understand.
Even in a hurry, you can consider contracts separately
One option is to request temporary work to stop damage spreading, then compare full repairs after investigation. Two visits may create separate costs, so check each charge and how they relate. Requesting temporary work should not automatically commit you to the main construction.
Comparable information matters more than response counts
The number of estimates and response times vary with area, weather and contractor availability. If no response comes by your deadline, consider your previous contractor or another advice source too. You do not need to decide solely on lowest price, most replies or fastest work.
When requesting a quote through Fukkyu Idaten, see thechecklist for a lump-sum quoteto prepare your questions.
Quote review checklist
Check each company’s quote. Marks disappear when this page closes.
0 / 8 items checked
Frequently asked questions about this topic
How many companies should I ask?
There is no fixed right number. First align comparable conditions. Ask each company about fees and quote deadlines; do not force yourself to add more companies.
FAQ and related guidance checked October 4, 2026. Ask relevant contacts about individual conditions, current acceptance, and programs.
Content errors, rights concerns or service information changes:Contact Kaneyoshi Miwa (Japan Product Management). Include the page URL and relevant passage. This is for routine inquiries, not emergency reporting.
What to learn next

Urgent roof repairs: a visit today versus a completed repair today
Urgent repairs can blur reception, site checks, temporary measures and main work. Clarify which conditions take priority.

What does a rain-leak investigation fee include?
Why do low and high leak-repair quotes differ? Cost items affecting totals, site-inspection questions, and comparison tips.

Extra repair costs: five checks before approval
If told extra substrate repairs are needed, check photos, reasons, price, duration, and alternatives.

Whom to hire for building repairs: contractors, comparison sites and Fukkyu Idaten
Warranty, rentals, routine work and urgent repairs: choose existing contacts, specialists or comparison services for your situation.
Before arranging repairs in Japan
You do not need to rush a decision when you do not understand the documents or explanation.
An estimate and a contract have different purposes
An estimate (見積書) describes proposed work and its price. If you do not understand what you would be agreeing to, ask about the work, extra charges and schedule before deciding.
If communicating in Japanese is difficult
Ask in advance whether an interpreter can help and which languages the provider supports. Translated articles do not mean that our phone service or contractors provide English or Vietnamese support.
Reference: Housing Renovation and Dispute Settlement Support Center — estimate consultations
Words used in this article
Short explanations, with the Japanese words you may hear in everyday life.
- Scaffolding 足場(ashiba)
A structure assembled so workers can carry out work safely at height.
Whether it is needed depends on the height and work location. Do not climb it yourself.
- Warranty 保証(hoshou)
Conditions describing how certain problems after the work will be handled.
Check coverage, period, exclusions and contact details in writing; a warranty does not make every repair free.
- Written estimate 見積書(mitsumorisho / mitsumori)
A document showing proposed work, materials and costs before you place an order.
Ask for explanations of Japanese wording you do not understand before signing an agreement.
- Additional charges 追加費用(tsuika hiyou / tsuika ryoukin)
Costs added later to the amount first proposed.
Confirm the extra work, reason and amount in writing before that work starts.
Plain-language explanations by Tatemono Fukkyu Note. They are not an assessment of your building or an individual evacuation decision.